Advertisement

Ad promo image large
  • Published Date

    October 13, 2021
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

Paid Advertisement WHAT WE ARE REALLY GETTING???? High School Building (2-Story) In March of 2019, we were shown an 47 acre plateau campus (development concept A) with all the amenities our children could possibly want. Site Layout Base Option MS y Fast forward to the 27 acre plateau site layout (base option) that was submitted to the Leet Township Zoning Hearing Board. ing on uing e 100 Ata Oddly all the things missing on the actual plan are the reasons used to condemn 625 Beaver St as an option. Other than more trees, the Actual plan doesn't offer any additional amenities that couldn't be pro- vided with a New Build on our current site. In fact, the camp meeting site offers less. There is NO Stadium and there is no guarantee that QVSD could get a variance for one. Environmentally it is a not responsible com- pared to reusing an existing site for several reasons. eng arE ASor ting 21 pe Seeoadary SteEntry Even QVSD's own Geotechnical expert admitted that the current 27 acre plateau site plan applied for isn't as safe for downslope neighbors as the 47 acre plateau site plan. QVSD requested they scale back the plan due to it's significant costs - thus eliminating the additional slope stability above Leetsdale homes that had originally been included. EGH SCHOOL BULDING POTENTAL STADUM EPANSON TENNIS COURTS All the necessary utilities are at the current high school location. The Walker estate remains is potential environmentalist's dream. Blasting and developing on landlslide prone soils can be com- pletely avoided, thus ensuring the safety of the downslope Leetsdale neighbors. PRACTICE IT'S TIME TO GIVE RELD POENTAL FUTR OON 625 BEAVER STREET FLD NOUM/ DSTRICT ADMINISTRATION OFFICE ANOTHER LOOK! Paid for by Citizens for a Great School Mail Donations to: CGS P.O Box 555 Sewickley, PA 15143 300 SITE DEVELOPMENT CONCEPT A Paid Advertisement WHAT WE ARE REALLY GETTING???? High School Building (2-Story) In March of 2019, we were shown an 47 acre plateau campus (development concept A) with all the amenities our children could possibly want. Site Layout Base Option MS y Fast forward to the 27 acre plateau site layout (base option) that was submitted to the Leet Township Zoning Hearing Board. ing on uing e 100 Ata Oddly all the things missing on the actual plan are the reasons used to condemn 625 Beaver St as an option. Other than more trees, the Actual plan doesn't offer any additional amenities that couldn't be pro- vided with a New Build on our current site. In fact, the camp meeting site offers less. There is NO Stadium and there is no guarantee that QVSD could get a variance for one. Environmentally it is a not responsible com- pared to reusing an existing site for several reasons. eng arE ASor ting 21 pe Seeoadary SteEntry Even QVSD's own Geotechnical expert admitted that the current 27 acre plateau site plan applied for isn't as safe for downslope neighbors as the 47 acre plateau site plan. QVSD requested they scale back the plan due to it's significant costs - thus eliminating the additional slope stability above Leetsdale homes that had originally been included. EGH SCHOOL BULDING POTENTAL STADUM EPANSON TENNIS COURTS All the necessary utilities are at the current high school location. The Walker estate remains is potential environmentalist's dream. Blasting and developing on landlslide prone soils can be com- pletely avoided, thus ensuring the safety of the downslope Leetsdale neighbors. PRACTICE IT'S TIME TO GIVE RELD POENTAL FUTR OON 625 BEAVER STREET FLD NOUM/ DSTRICT ADMINISTRATION OFFICE ANOTHER LOOK! Paid for by Citizens for a Great School Mail Donations to: CGS P.O Box 555 Sewickley, PA 15143 300 SITE DEVELOPMENT CONCEPT A